Pre Owned Stock

150-300 Tph Gold Plant For Sale

  • Primary Crusher to tailings handling, elution and smelting.
  • Modern design
  • Already dismantled
  • Packaged for freight
  • Spares also available

Additional info Click here

Mills Available

  1. 24x41ft, 14 000kW Ball Mill (New Mill Unused)
  2. 20x32ft, 6500kW Ball Mill (New Mill partially built)
  3. 18x24ft, 4200kW Ball Mill
  4. 16x30ft, 3000kW SAG Mill
  5. 16x24ft, 3000kW Ball Mill
  6. 14x16ft, 2000kW Ball Mill
  7. 12x18ft, 1250kW Ball Mill (New Mill partially built)
  8. 10x14ft, 600kW Rod Mill

Overhead Cranes Available

  1. DEMAG 50 ton, 30m span double girder gantry crane including 110m of long travel beams.
  2. MORRIS 50ton, 25m span double girder gantry crane.

Mill Discharge Pumps

  1. 2 of Warman 20/18 AH Mill Discharge Pumps
  2. 4 of Warman 12/10 AH Mill Discharge Pumps

Crushers Available

  1. Metso C125 Single Toggle Jaw Crusher
  2. Metso VB93 25x36in Single Toggle Jaw Crusher includes spare main frame.
  3. 36x48in Complete Primary Crushing Station incl Primary Bin, Apron Feeder, Structure & all chute work, dismantled and stored at NCP premises.
  4. 1 of Osborn 30x42in Mobile Track mounted crusher.
  5. Metso symons 4.25ft Short Head Cone Crusher
  6. Metso C140 Jaw Crusher with Spares (550 CFM, 8 Bar 1500rpm, 110kW Fully serviced and ready to run. Includes sound hood. Nice modern machine.)

Metso symons 4.25ft Short Head Cone Crusher

Metso C140 Jaw Crusher with Spares

Super Air Compressor SA160

  1. 1010CFM, 7.5Bar 2950rpm, 160kW Fully serviced and ready to run.

4000 TPD Backfill Plant

A dual-binding component system uses ground glass blast furnace slag and normal cement in dry powder form to bind dewatered tailings via deep cone thickener and mixing plant. Dewatering in the thickener is aided by flocculant addition, and features underflow recirculation to prevent excessive underflow compaction and allows ease of pumping. A lab room allows interval sample testing, simulating underground conditions to test curing time and binding strength of backfill

Complete including:

  1. 2x silos
  2. 2x screw conveyors
  3. Mixing plant
  4. Deep cone fls 18m high rate thickener (incl new floc plant)
  5. Prep plant
  6. 2x putzmeister concrete pumps and all related hydraulics
  7. All electrics and control systems
  8. Piping

Includes full laboratory for product testing